Depending on the number of analyzers automated systems may involve 50 to 60 feet of linear track bolted to the floor.
Clinical laboratory medical technology laboratory floor plan.
Laboratory risk assessment tool.
An extensive period of pre planning is vital to the design of a lab.
Describe some key features of effective lean design.
Describe some things to avoid.
Lab safety surveys and inspections.
Describe how to plan a design project for a clinical laboratory.
At a high level specimens are received sorted and routed to one of these three areas of processing.
For experimental spaces sketch out the dimensions of laboratory grade furniture benches desks equipment shelves wash areas on the architectural floor plan.
Automated testing systems an advancing lab technology is facilitated by open plan lab design.
Laboratory services national strategic plan 2008 national strategic plan for laboratories 2008 2012 version 2 feb 2007 introduction the role of medical laboratories iso 15189 2003 defines the medical laboratory clinical laboratory as a laboratory for biological.
Workshopping with those who will be using the area themselves is essential since the lab can be tailored to what the research requires and superfluous elements can be quickly identified.
15 clinical laboratories 216 15 1 description 216 15 2 laboratory layout 218 15 3 heating ventilating and air conditioning 222 15 4 loss prevention industrial hygiene and personal safety 223 16 teaching laboratory 227 16 1 description 227 16 2 laboratory layout 228.
Present a limited case study of using lean to design a core laboratory.
Accident and injury reporting.
Present some examples of using lean to improve operational efficiency.
Confined space entry program.
In addition floor standing centrifuges are noisy and dangerous as are large irradiators and will often require a room with a lockable door.
In an automated system analyzers are arranged along a robotic track that operates much like a conveyor belt.